Installation method
It is necessary to survey before installation
The host has high requirements for the installation space
Before installing the DC inverter monobloc heat pump for heating & cooling, inspect the installation site to determine the installation position for the main engine. If the base of the host equipment is determined to be installed on the ground, cement can be used. The thickness of cement is about 15cm ~ 20cm. Place the host and adjust the position of the unit to ensure that the host is placed smoothly. Connecting the water system, mainly between the main engine and the water tank water pump, valve body, filter, and other parts of the connection. Connecting the circuit system is mainly to connect the power line, water pump, solenoid valve, water temperature sensor, pressure switch, etc. according to the requirements of the wiring diagram. A water pressure test detects the pipeline connection leakage phenomenon. Machine trial run, check the parameters of the system. Pipeline insulation, such as the use of rubber and plastic insulation materials for water system insulation.
Before installing the main engine of the DC inverter monobloc heat pump for heating & cooling, it is very necessary to survey the installation site. Air source heat pump supply enterprises to enter the household field view, put forward the heating design scheme and the relevant indicators, residents are satisfied, identified, and signed, enterprises and users can sign the heating equipment supply and installation contract.
DC inverter monobloc heat pump for heating & cooling has high requirements for the space environment of installation, and the installation has different requirements in different locations. The air source heat pump host can be installed on the ground, on the roof, or on the wall. If it is installed on the ground or wall, in order to ensure that the heat absorption and heat dissipation of the host heat exchanger is not hindered, the distance between the host and the surrounding walls or other occlusions can not be too small, in addition to the equipment foundation to do a good job. The device is installed on the ground and secured by expansion bolts. If it is installed on the roof, it is necessary to consider the bearing capacity of the roof. A roof that cannot meet the bearing requirements is resolutely not allowed to be installed. Can be installed on the roof, should pay attention to the air source heat pump direction, the main engine wind direction is best installed downwind so that the heat transfer effect of the main engine will be good.
You can refer to the above to install the device.